|
|
|
|
Kobe Steel to Double Capacity of No.2 Slabbing Mill of Kakogawa Works--THE 15th GUANGZHOU INTERNATIONAL PLATEMETAL, BAR, WIRE, METAL PROCESSING & SETTING EQUIPMENT EXHIBITION 11/26/2013 金屬板材展-線材展-sheet metal expo,wire expo |
--------------------------------------------------------------------------------------------------------------- |
|
Kobe Steel add a heating furnace to 2 furnaces in No.2 slabbing mill of Kakogawa Works, and increase processing capacity from monthly 150000 tons to 300000 tons. It is the expansion to increase billet, bloom output for Kobe Steel associated with consolidation of upper process to Kakogawa, that is planned in fiscal 2017.
金屬板材展-棒材展-線材展-金屬加工展-2014第十五屆廣州國(guó)際金屬板材、棒材、線材及金屬加工、配套設(shè)備展—全球三大金屬展之一巨浪展覽- THE 15th GUANGZHOU INTERNATIONAL PLATEMETAL, BAR, WIRE, METAL PROCESSING & SETTING EQUIPMENT EXHIBITION
|
|
|
|
|